Close Menu
newzz.net
    Facebook X (Twitter) Instagram
    Trending
    • These are the 10 best Shizuku apps for leveling up Android
    • Adani Green takes ₹1,200–1,500 cr EBITA hit from transmission constraints; slows capacity additions
    • Conservation Leadership Academies Connect University Students to Audubon
    • Munster vs Ulster: Time and TV channel info, live stream, betting odds and team news
    • The Sony Xperia 1 VIII looks great, if you happen to live somewhere Sony still sells phones
    • Uniqus Consultech Signs Strategic Collaboration with Surya Financial Technologies
    • What DOJ’s Schedule III Action Really Means for the Cannabis Industry Right Now
    • BP suffers major shareholder revolt over climate roll-back  – A greener life, a greener world
    newzz.net
    Saturday, April 25
    • Home
    • Top Stories
    • Technology
    • Business
    • Politics
    • Health
    • Loans
    • Interest Rates
    • Mortgage
    • Entertainment & Arts
    • Science & Environment
    • Smart Solutions
    newzz.net
    You are at:Home»Business»Adani Green takes ₹1,200–1,500 cr EBITA hit from transmission constraints; slows capacity additions
    Business

    Adani Green takes ₹1,200–1,500 cr EBITA hit from transmission constraints; slows capacity additions

    Editorial TeamBy Editorial TeamApril 25, 2026No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Adani Green takes ₹1,200–1,500 cr EBITA hit from transmission constraints; slows capacity additions

    Facing transmission constraints that led to curtailment of power, Adani Green Energy Ltd (AGEL) has not only slowed renewable capacity additions, but has also taken an estimated ₹1,200–1,500 crore hit to EBITA in FY26.

    AGEL indicated that while curtailment resulted in an immediate EBITA hit of around ₹500 crore, the broader impact — when benchmarked against expected merchant power tariffs going forward — could be significantly higher, taking the total loss to ₹1,200–1,500 crore.

    “We have lost about ₹500 crore of EBITA in the past year on account of curtailment. If you look at the rates at which we are looking at contracting our merchant capacities going forward versus the realisation that we had in the past year, the loss will be in the range of ₹800 crore to ₹1,000 crore. So we would have lost somewhere in the range of ₹1,200-1,500 crore of EBITA in the past year, which we do not expect to happen going forward in the coming year and the year after that,” Sagar Adani told investors on Friday evening.

    Also read: Adani Green to invest ₹15,000 cr in BESS as FY27 capex rises to ₹45,000 cr; Rajasthan to emerge as key storage hub

    The losses were driven by the inability to evacuate electricity due to inadequate transmission infrastructure, resulting in renewable power being curtailed and going unsold. “The power that is curtailed today, goes waste. So when you put up a battery storage capacity, you use otherwise wasted power, which today has zero economic value, into BESS, making the cost of it very low and hence for a limited time perspective the margins are significantly high,” he said.

    In response, the company is moderating its expansion pace despite having higher execution capability. “ AGEL has both the financial flexibility and the organisational capability to execute 7-8 GW in a given year. We are stopping our execution at 4.5-5 GW looking at the transmission and evacuation constraints. We do not want to repeat the mistake of the past year going forward,” Adani said.

    As a mitigation strategy, AGEL is accelerating investments in battery energy storage systems (BESS), which can store excess generation and release it during peak demand hours. “We expect to commission more than 10 GW/hour in this coming year. This is a very substantial battery addition that AGEL is in the process of executing,” he added.

    Published on April 25, 2026

    Adani additions capacity constraints EBITA green hit slows Takes Transmission
    Previous ArticleConservation Leadership Academies Connect University Students to Audubon
    Next Article These are the 10 best Shizuku apps for leveling up Android
    Editorial Team
    • Website

    Related Posts

    Uniqus Consultech Signs Strategic Collaboration with Surya Financial Technologies

    Inside India’s aviation crisis: Detours, duties, and deep losses

    FSIB invites application from private sector too for selection of public sector banks’ EDs

    Comments are closed.

    • Facebook
    • Twitter
    • Instagram
    • Pinterest
    Don't Miss

    These are the 10 best Shizuku apps for leveling up Android

    Adani Green takes ₹1,200–1,500 cr EBITA hit from transmission constraints; slows capacity additions

    Conservation Leadership Academies Connect University Students to Audubon

    Munster vs Ulster: Time and TV channel info, live stream, betting odds and team news

    About

    Welcome to Newzz.net, your trusted source for timely, accurate, and insightful news from around the world. We are dedicated to delivering the latest updates and in-depth analysis across a wide range of topics, ensuring our readers stay informed, empowered, and engaged.
    We're social, connect with us:

    Popular Posts

    These are the 10 best Shizuku apps for leveling up Android

    April 25, 2026

    Adani Green takes ₹1,200–1,500 cr EBITA hit from transmission constraints; slows capacity additions

    April 25, 2026

    Conservation Leadership Academies Connect University Students to Audubon

    April 25, 2026
    Categories
    • Business
    • Entertainment & Arts
    • Health
    • Interest Rates
    • Loans
    • Mortgage
    • Politics
    • Science & Environment
    • Smart Solutions
    • Technology
    • Top Stories
    Copyright © 2026. newzz.net Designed by Webwazirds7.
    • About Us
    • Privacy Policy
    • Terms and Conditions
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.