Close Menu
newzz.net
    Facebook X (Twitter) Instagram
    Trending
    • Noel Tata seeks Tata Sons board meeting recordings over Chandrasekaran’s reappointment
    • What the West Got Wrong About Afghanistan and Syria
    • The race to deliver in Antalya
    • Google Meet adds direct sharing for Docs, Sheets, and Slides
    • India customs dispute holds up $66 million of Scotch Whisky
    • 590. Are American Tech Billionaires Beyond All Control?
    • Bird Trends in Latin America and the Caribbean
    • Bryant ‘very close’ to intervening over Stormont budget impasse
    newzz.net
    Friday, November 20
    • Home
    • Top Stories
    • Technology
    • Business
    • Politics
    • Health
    • Loans
    • Interest Rates
    • Mortgage
    • Entertainment & Arts
    • Science & Environment
    • Smart Solutions
    newzz.net
    You are at:Home»Business»KP Group targets 10 GW each in owned power, EPC and 10 GWh battery manufacturing by FY32
    Business

    KP Group targets 10 GW each in owned power, EPC and 10 GWh battery manufacturing by FY32

    Editorial TeamBy Editorial TeamOctober 5, 2026No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email

    KP Group on Monday unveiled KP 3.0, a strategic roadmap that raises its FY32 targets to 10 GW of owned renewable generation through KPI Green Energy, 10 GW of third-party EPC execution, and 10 GWh of integrated battery manufacturing capacity, including cell production and BESS assembly.

    The announcement was made at the group’s Investor Day in Mumbai. The revised ambitions follow KP Group reaching a total portfolio of 9.21 GW across solar, wind, and hybrid assets, with the group saying the remaining capacity is expected to be added within the next few quarters.

    The group’s operating platform currently includes around 12,104 acres of land, 5.10 GW of power evacuation capacity, a 6.4 GW EPC portfolio, and a 2.8 GW IPP portfolio.

    KP 3.0 also introduces a new layer of professional leadership across renewable energy, international business, green hydrogen, investor relations, and governance.

    New business verticals being scaled include BESS through Sundrops Energia, floating solar with a 110 MW AC project at Kadana Dam in Gujarat, energy trading under CERC and GERC licences, and green hydrogen — with a 1 MW operational electrolysis plant at Matar producing 432 kg per day.

    The group is also pursuing international opportunities in Botswana, Zambia, Tanzania, and Saudi Arabia. In Botswana, an initial 500 MW phase is planned within a proposed 5 GW development.

    Founded in 1994, KP Group operates three publicly listed entities: KPI Green Energy, KP Energy, and KP Green Engineering.

    Published on October 5, 2026

    Battery EPC FY32 group GWh manufacturing owned Power targets
    Previous Article209. Shabana Mahmood: Palestine Action, Faith and What I Told Starmer
    Next Article Pixel lock screen customization would be so much easier this way
    Editorial Team
    • Website

    Related Posts

    Noel Tata seeks Tata Sons board meeting recordings over Chandrasekaran’s reappointment

    India customs dispute holds up $66 million of Scotch Whisky

    karnatakas proposed taxi meter rule raises concerns over regulatory uncertainty in mobility sector

    Comments are closed.

    • Facebook
    • Twitter
    • Instagram
    • Pinterest
    Don't Miss

    Noel Tata seeks Tata Sons board meeting recordings over Chandrasekaran’s reappointment

    What the West Got Wrong About Afghanistan and Syria

    The race to deliver in Antalya

    Google Meet adds direct sharing for Docs, Sheets, and Slides

    About

    Welcome to Newzz.net, your trusted source for timely, accurate, and insightful news from around the world. We are dedicated to delivering the latest updates and in-depth analysis across a wide range of topics, ensuring our readers stay informed, empowered, and engaged.
    We're social, connect with us:

    Popular Posts

    Noel Tata seeks Tata Sons board meeting recordings over Chandrasekaran’s reappointment

    November 20, 2026

    What the West Got Wrong About Afghanistan and Syria

    November 20, 2026

    The race to deliver in Antalya

    November 20, 2026
    Categories
    • Business
    • Entertainment & Arts
    • Health
    • Interest Rates
    • Loans
    • Mortgage
    • Politics
    • Science & Environment
    • Smart Solutions
    • Technology
    • Top Stories
    Copyright © 2026. newzz.net Designed by Webwazirds7.
    • About Us
    • Privacy Policy
    • Terms and Conditions
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.